
E1/E20 Emulator Appendix A
R20UT0398EJ0400 Rev.4.00 Page 34 of 39
May 16, 2014
(3) As soon as the self-checking program is started.
“TEST1 is running.” and “TEST2 is running.” are shown on the screen. If the emulator correctly completes TEST1
and TEST2, “TEST1: PASS” and “TEST2: PASS” are displayed.
Figure A.7 Running the Self-Checking Program
(4) When TEST3 is entered, the following message appears.
“Please remove the User interface cable from the self-checking connector to execute TEST3.”
After this message has been displayed, disconnect the user interface cable from the self-checking connector and
close the lid of the self-checking connector. Then click on the [OK] button to continue with the self-checking
process.
If the user interface cable is still connected to the self-checking connector or user system, clicking on the [OK]
button does not restart the self-checking process.
Figure A.8 Message [Please remove the User interface cable from
the self-checking connector to execute TEST3.]
Komentáře k této Příručce